Nov 12, 2024 Local News
St. Francois Co., Mo. (KFMO) - Route D in St. Francois and Ste. Genevieve Counties will be reduced to one lane with a 10-foot width restriction as contractor crews perform asphalt overlay.
Flaggers and a pilot car will be in place to guide traffic. This section of roadway is located from Route EE near Farmington, Missouri to Route Y near French Village, Missouri. Weather permitting, work will take place Monday, Aug. 12 through Saturday, Aug. 31 from 7 a.m. to 7 p.m. daily.
The work zone will be marked with signs. Motorists are urged to use extreme caution while traveling near the area.